Turbine No.18 Replacement, Fenner Wind Farm, Cazenovia, New York
CME conducted a fast-track geotechnical evaluation for GES USA, Inc. The study included a review of geologic reports for the site area, conducting the subsurface exploration, performing laboratory testing, conducting a eotechnical evaluation, and preparing the geotechnical report containing soils related recommendations for design and construction of the tower foundation.